Mix
Rubber granules are blended with binder to the right consistency for your surface.
Rubber paving is mixed on site, poured, and finished into a seamless surface. Most projects install in about a day, then need roughly 24–48 hours to cure before full use.
Cracked concrete to a coloured rubber surface over the existing slab. Drag the slider to compare — real after photo with an AI-aligned before match of the same angle.
Mix → prime → pour → finish → cure.
Rubber granules are blended with binder to the right consistency for your surface.
The existing substrate (concrete, asphalt, wood, or prepared base) is primed for adhesion.
The mix is poured and levelled across the area for even coverage and thickness.
Trowel and roll to a smooth, seamless finish that matches the design intent.
Allow roughly 24–48 hours to cure before full traffic — timing confirmed for your job.
Built for prairie weather and practical property maintenance.
Rubber moves with temperature swings — more crack-resistant than rigid concrete pours.
Often installs over concrete, asphalt, or wood with less demolition and haul-away.
Surfaces use recycled rubber content (including Shercom recycled-tire materials) to divert waste from landfills.
Better footing in snow and ice seasons, with salt-friendlier care compared with bare concrete.
Damaged areas can often be patched rather than replacing an entire slab.
A&B provides a 5-year limited warranty on installation and material defects as stated on our benefits materials. Ask during your estimate for current coverage details — we don’t expand legal warranty text on this site.
Share photos, dimensions, and your city — we’ll advise on prep, colour, and timeline.